

Project Owner: ADMIE S.A.
Client: Grid Solutions Hellas S.A.
Cyclades interconnection to the Greek electricity transmission system: 150kV/20kV step-down substations on Syros and Mykonos islands.
Installation of GIS, power transformers, power reactors, grounding, metal structures, cabling, and HV/MV/LV equipment.
